Brief Information: locate the pipeline position which were constructed in HDD work method. Located 25 HDD pipeline positions and total length is longer than 10 km.
Work Location: In Shanghai China.
Survey devices: Paratrac2 System
Work Duration:2022/04-2022/09
OWNER: SNP
This is the first time that using P2 system to locate the accurate underground pipeline positions in China.