Pipeline Crossing Engineering (Thailand) Co., Ltd (PCE) is the subsidiary company of Jiangsu Goodeng Engineering Machinery Assembling Co., Ltd., which is a professional company specializing in pipeline HDD and other pipeline construction. Persisting the core business of pipeline construction technology, emphasizing its high-level business, PCE develops its way of growing by implementing the HDD, Boring and other pipeline construction, integration of construction and service, integration of domestic and international markets.
Jiangsu Goodeng Engineering Machinery Assembling Co., Ltd. (hereinafter referred to as "the company") , Legal representative is Chen Fenggang, company business address: north of west gongjian road, dafeng industrial park Changzhou high-tech zone, dafeng district, yancheng city, the company's business scope: engineering machinery, construction machinery and accessories, steel structures, general equipment research and development, manufacturing and after-sales service; Construction machinery leasing; Car sales; Self-management and agent of all kinds of goods and technology import and export business(except goods and technology country is limited or prohibited); Car sales(item subject to approval pursuant to the law or related authority approval then to operate). The company can manufacture different kinds of HDD drill rigs from 20 tons to 1200 tons, jacking machine, TBM machine, etc, has developed one of the biggest trenchless machine manufacturer.
PCE has constructed more than 60 HDD and lots of other pipeline construction, totally more than 25 km HDD. Some of PCE key persons have constructed pipelines in China such as Song Huajiang River Crossing Technical Director of HDD Crossing Project, Jiangyin Yangtze River EPC HDD Project, etc. After PCE establishing, it had completed many big projects in different countries like 1400 meters gulf HDD crossing which is the biggest HDD project in Thailand, 4060 meters Dongming sea area crossing, etc. Through these projects, PCE has strengthened its position as a big pipeline construction contractor in China.
Internationally, PCE and his workers has executed lots of pipelines construction in various countries such as in Thailand, Bangladesh, Philippines, Pakistan, Malaysia and other countries, which has been built an international famous brand.
Company Name |
Pipeline Crossing Engineering (Thailand)Co., Ltd. |
Tel. No |
+66 996107910 |
Company Address |
199/83 Onnut 65 Yak 14, Pravet, Pravet, Bangkok 10250 |
Fax No |
|
Enterprise nature |
Thailand |
Founding Time |
2017.09.26 |
Registered Capital |
2,000,000 Thai Baht |
Legal Representative |
Ms. An Weihua |
Business License Number |
Taxpayer Identification Number 0115560023042 head office |
||
Business Scope |
Contract for pipeline construction, lease of large machinery and construction equipments, sale of oil and lubricants, investment and management consultants, and provide engineering management advice for technical projects |
||
Corporate Expertise |
Pipeline Construction especially in HDD Crossing, Boring Crossing. |
No. |
Project Name |
Project Scale |
Quality Safety Situation |
Project Leader |
Completion Time |
Owner |
1 |
5TP Project –Phase 1-HDD 07# Crossing |
650 meters/42 inch/ Rock |
Good |
Wang Min |
2018.05 |
PTT |
2 |
5TP Project –Phase 1-HDD 11# Crossing |
460 meters/42 inch/ Rock |
Good |
Wang Min |
2018.08 |
PTT |
3 |
5TP Project –Phase 1-HDD 01# Crossing |
1400 meters/42 inch/ Sand&Soil |
Good |
Wang Min |
2019.02 |
PTT |
4 |
5TP Project –Phase 1-HDD 02# Crossing |
750 meters/42 inch/ Rock |
Good |
Wang Min |
2019.05 |
PTT |
5 |
NFPT KP70 HDD Crossing |
570 meters/14 inch/ Sand&Soil |
Good |
Xu Liangkui |
2018.03 |
FTP |
6 |
NFPT KP89 HDD Crossing |
575 meters/14 inch/ Sand&Clay |
Good |
Xu Liangkui |
2018.04 |
FTP |
7 |
NFPT KP91 HDD Crossing |
475 meters/14 inch/ Sand&Clay |
Good |
Xu Liangkui |
2018.04 |
FTP |
8 |
NFPT KP285 HDD Crossing |
470 meters/14 inch/ Sand&Clay |
Good |
Xu Liangkui |
2018.05 |
FTP |
9 |
NGD-2 Industrial Zone Project |
600 meters/4 hdd/12 inch/ Rock |
Good |
Xu Liangkui |
2018.11 |
QTEC/PTT /GULF |
10 |
NGD-4 Industrial Zone Project |
550m/5HDD/ 12 inch/ Rock |
Good |
Xu Liangkui |
2019.01 |
QTEC/PTT /GULF |
11 |
RRPP-MINI HDD |
3km/30inch/ Sand&Clay |
Good |
Xu Liangkui |
2019.05 |
PTT |
12 |
RRPP- HDD |
3.5km/30inch/ Sand&Clay |
Good |
Xu Liangkui |
Ongoing |
PTT |
13 |
Zhujiahe River HDD Crossing |
1800 meters/20 inch/ Clay |
Good |
Yang Dachun |
2018.05 |
Sinopec |
14 |
Cangzhou HDD Crossing |
550 meters/40 inch/ Clay |
Good |
Yang Dachun |
2018.08 |
Sinopec |
15 |
Dongming Sea area HDD Crossing |
4200m/ 20inch/Sand |
Good |
Yang Dachun |
Ongoing |
Sinopec |
No. |
Name |
Year experience |
Specialty |
Position |
1 |
Ma Dianfei |
15 |
Industrial Engineering |
General Manager |
2 |
Xu Liangkui |
9 |
Geological Engineering |
Project Manager |
3 |
Wan Yang |
9 |
Mechanical Engineering |
Project Manager |
4 |
Yang Dachun |
20 |
HDD Crossing Construction |
Supervisor |
5 |
Wang Min |
10 |
Civil Engineering |
Construction Manager |
6 |
Xia Wenchao |
5 |
Mechanical Engineering |
Technical Engineer |
7 |
Bai zhongjuan |
6 |
Civil Engineering |
Quality Inspector |
8 |
Chen jiawei |
5 |
Mechanical Engineering |
Technical Engineer |
9 |
Li minggang |
7 |
HDD Crossing Construction |
Driller |
10 |
Shi yangcheng |
10 |
Mechanical Engineering |
Mechanical Engineer |
11 |
Ma chengzhuang |
21 |
HDD Project Management |
Supervisor |
12 |
Liu wutian |
16 |
HDD Crossing Construction |
Mud Engineer |
13 |
Wang Yuanbin |
9 |
HDD Crossing Construction |
Foreman |
14 |
Zou Hengcong |
9 |
HDD Crossing Construction |
Foreman |
15 |
Wei Xing |
10 |
HDD Mud Engineering |
Mud Engineer |
16 |
Xiao Hongwei |
10 |
Electric Engineering |
Electrician |
17 |
Kuang Tong |
4 |
HDD Crossing Construction |
Driller |
18 |
Wang Yizhong |
20 |
Electric Engineering |
Electrician |
19 |
Cao Yabin |
10 |
HDD Crossing Construction |
Driller |
No. |
Equipment |
Specifications |
Quantity |
1 |
HDD Rig |
GD6000-L (600 Tons Pulling Load) |
1 |
2 |
HDD Rig |
GD5000-L (500 Tons Pulling Load) |
1 |
3 |
HDD Rig |
GD3500-L (350 Tons Pulling Load) |
1 |
4 |
HDD Rig |
GD3000-L (300 Tons Pulling Load) |
1 |
5 |
HDD Rig |
GD1100-L (110 Tons Pulling Load) |
1 |
6 |
HDD Rig |
GD450-L (45 Tons Pulling Load) |
1 |
7 |
HDD Rig |
GD950-L (95 Tons Pulling Load) |
1 |
8 |
Mud Pump |
GN-2500(2.5 m³/min) |
5 |
9 |
Mud Pump |
GN-1500(1.5 m³/min) |
2 |
10 |
Mud Pump |
GN-760(0.8 m³/min) |
2 |
|