Project

BSPP2-HDD Project in Thailand

  28/08/2567

-HDD  Brief  Information: 1150&1100m /36 inch/ Steel Gas Pipe, clay and sand

-Information: Bangpakong area in Thailand

-HDD Rig: GSC-6000L, The maximum pullback force is 600 tons

-Con. Duration:2024/8/1 Ongoing

-Owner: PTT , Contractor: SNP

721.jpg (56 KB)  722.jpg (46 KB)