Project

NS-HDD Project in Thailand

  28/08/2567

-HDD  Brief  Information: 6100m /6 inch/ Steel Gas Pipe, granite Rock and Sand Rock

-Information: Nakhon Sawan area in Thailand

-HDD Rig: GS-2200L, The maximum pullback force is 220 tons

                  GD-1100L, The maximum pullback force is 110 tons

                  GD-450L, The maximum pullback force is 360 tons

- Con. Duration:2023/9/1-2024/5/5

- Owner: PTT , Contractor: YJ

* The most difficulty technical issue is crossing the gravel stratum with rock.

811.jpg (71 KB)  812.jpg (50 KB)