Project

HINKONG Project in Thailand

  28/08/2567

-HDD  Brief  Information: 6206m /24 inch/ Steel Gas Pipe, Clay Rock and Sand Rock

-Information: Rachaburi area in Thailand

-HDD Rig: GS-2200L, The maximum pullback force is 220 tons

                 GD-1100L, The maximum pullback force is 110 tons

                 XCMG-3600L, The maximum pullback force is 360 tons

- Con. Duration:2022/6/1-2023/5/5

- Owner: GULF , Contractor: CPP, PMC: WORLEY

711.jpg (71 KB)  712.jpg (64 KB)  713.jpg (81 KB)