-Brief Information: Fuel steel pipeline, 14 inch, clay/sand,total HDD length is 720m.
-Work Location: In Bangkok of Thailand.
-HDD Rig: GS2200-L
-Work Duration:2022/02-2022/04
-OWNER/Main-Contractor: FPT/TRITON
*Work difficulties: drilling depth is 45 meters, working in the big city, and the exit pit is only 0.3m width.