Brief Information: Gas steel pipeline, 28 inch mainline and 4”, Granite (hard rock),total HDD length is 1102m, 1 crossing.
Work Location: In Rayong of Thailand.
HDD Rig: GS6000C-LS
Work Duration:2022/03-2022/08
OWNER: PTTLNG
28”Mainline and 4”HDPE FOC casing pullback together in the same borehole.