Project

5TP Phase1 Project in Thailand

  09/09/2565

Brief Information: Steel Gas Pipeline,42inch, soil, the total completed BORED length is 108m.

Work Location: Chachongsao,Thailand.

Jacking Machine: TPN1066

Work Duration:2019/10/05-2019/11.18