Project

NFPT Project in Thailand

  09/09/2565

Brief Information: Oil steel pipeline, 12 inch, Granite (hard rock),HDD length is 1400m, 665m, 735m and 220m.

Work Location: In TAK City of Thailand.

HDD Rig: GD-3500L, GD-2200L

Work Duration:2021/02/01-2021/5/13