Project

NFPT Project in Thailand

  09/09/2565

Brief Information: Oil steel pipeline, 12 inch, Granite (hard rock), From KP37+840-KP39+930,HDD length is 2090m.

Work Location: In north of Thailand.

HDD Rig: GD-6000L, GD-4000L

Work Duration:2020/02/10-2020/08/10

The longest hard rock intersecting HDD  crossing in Thailand!