Brief Information: Oil steel pipeline, 12 inch, Granite (hard rock), From KP37+840-KP39+930,HDD length is 2090m.
Work Location: In north of Thailand.
HDD Rig: GD-6000L, GD-4000L
Work Duration:2020/02/10-2020/08/10
The longest hard rock intersecting HDD crossing in Thailand!