Project

RRPP HDD Project in Thailand

  09/09/2565

HDD  Brief  Information: 5022m /30inch/ Steel Pipe/  Gravel, sand and Rock Stratum

Project Information: Rachaburi area, RRPP Project in Thailand

HDD Rig: GD-3000L, The maximum pullback force is 300 tons

GD-1100L, The maximum pullback force is 110 tons

Con. Duration:2018/12/15-2019/12/25

Owner: PTT , Contractor: CPP, PMC: Penspen