HDD Brief Information: 1700m /36 inch/ Steel Pipe/ Soil Stratum
Project Information: 5TP Project in Thailand
HDD Rig: GD-6000L, The maximum pullback force is 600 tons
Con. Duration:2019/12/10- 2020/01/14, total 35 days
Owner: PTT , Contractor: SINOPEC, PMC: WORLEY