Project

5TP HDD20 Project in Thailand

  09/09/2565

HDD  Brief  Information: 1700m /36 inch/ Steel Pipe/  Soil Stratum

Project Information: 5TP Project in Thailand

HDD Rig: GD-6000L, The maximum pullback force is 600 tons

Con. Duration:2019/12/10- 2020/01/14, total 35 days

Owner: PTT , Contractor: SINOPEC, PMC: WORLEY