Project

5TP HDD7 Project in Thailand

  09/09/2565

HDD  Brief  Information: 600m /42 inch/ Steel Pipe/  Granite Rock Stratum

Project Information: Chonburi , 5TP Project in Thailand

HDD Rig: GD-6000L, The maximum pullback force is 600 tons

Con. Duration:2018/3/18- 2018/06/15, total 89 days

Owner: PTT , Contractor: SINOPEC