Project
RRPP in Thailand
09/12/2562
- Completed HDD Brief Information: 4.5km/5 mini HDD &1 HDD/30 inch/ Steel Pipe/ Gravel, sand and Rock Stratum
- Project Information: Rachaburi area in Thailand
- HDD Rig:GD3000L& GD-1100L, The maximum pullback force is 300 tons &110 tons
- Duration:2018/12/12- now
- Owner: PTT, Contractor: CPP