Project
NGD Industrial Zone Project in Thailand
09/12/2562
- HDD Brief Information: 1100m/9 HDD /12 inch/ Steel Pipe/ Gravel, sand and Rock Stratum
- Project Information: Rayong area, WHA-NGD Project in Thailand
- HDD Rig: GD-1100L, The maximum pullback force is 110 tons
- Duration:2018/09/12- 2019/01/08, total 120 days
- Owner: WHA, PTT, GULF , Contractor: QTEC