NGD Industrial Zone Project in Thailand

  09/12/2562
  • HDD Brief Information: 1100m/9 HDD /12 inch/ Steel Pipe/ Gravel, sand and Rock Stratum
  • Project Information: Rayong area, WHA-NGD Project in Thailand
  • HDD Rig: GD-1100L, The maximum pullback force is 110 tons
  • Duration:2018/09/12- 2019/01/08, total 120 days
  • Owner: WHA, PTT, GULF , Contractor: QTEC