Project

5TP HDD1 Project in Thailand

  09/12/2562
  • HDD Brief Information: 1400m /42 inch/ Steel Pipe/ Gravel, sand and Rock Stratum
  • Project Information: Rayong Gulf area, 5TP Project in Thailand
  • HDD Rig: GD-6000L, The maximum pullback force is 600 tons
  • Duration:2018/10/15- 2019/02/18, total 95 days
  • Owner: PTT , Contractor: SINOPEC