Project
5TP HDD1 Project in Thailand
09/12/2562
- HDD Brief Information: 1400m /42 inch/ Steel Pipe/ Gravel, sand and Rock Stratum
- Project Information: Rayong Gulf area, 5TP Project in Thailand
- HDD Rig: GD-6000L, The maximum pullback force is 600 tons
- Duration:2018/10/15- 2019/02/18, total 95 days
- Owner: PTT , Contractor: SINOPEC