-HDD Brief Information: 2200m*5/40inch/ Steel Pipe with pipe welding, clay/sand/rock -Information: Fuzhou area in China, HDD, Bored, Pipe..
Readmore-HDD Brief Information: 2100m*5/20inch/ Steel Gas Pipe with pipe welding, clay/sand/rock -Information: Guangdong area in China, HDD cross..
Readmore-HDD Brief Information: 4.5km /36 inch/ Steel Gas Pipe, clay and sand -Information: Bangpakong area in Thailand -Machine: TX-1000, Jacki..
Readmore-HDD Brief Information: 1150&1100m /36 inch/ Steel Gas Pipe, clay and sand -Information: Bangpakong area in Thailand -HDD Rig: GSC-6..
Readmore-HDD Brief Information: 6100m /6 inch/ Steel Gas Pipe, granite Rock and Sand Rock -Information: Nakhon Sawan area in Thailand -HDD Rig: ..
Readmore-HDD Brief Information: 6206m /24 inch/ Steel Gas Pipe, Clay Rock and Sand Rock -Information: Rachaburi area in Thailand -HDD Rig: GS-22..
Readmore-Brief Information: Fuel steel pipeline, 14 inch, clay/sand,total HDD length is 720m. -Work Location: In Bangkok of Thailand. -HDD Rig: GS2200-L -W..
ReadmoreProject owner : Sinopec International Co., Ltd. Location : Saraburi Province - Nakhon Ratchasima Province Job : Ø 24” Gas Pipeline P..
ReadmoreProject owner : TRC Construction Public Company Limited Project : GULF GNS Pipeline Project Location : Nong Sang Power Plant, Saraburi Province J..
ReadmoreProject owner: PTT Public Company Limited Project : Fifth Transmission Pipeline Project Phase 2 (5TP2) Location : Phra Nakhon Si Ayutthaya Provinc..
ReadmoreProject owner : PTT Public Company Limited Project : Fifth Transmission Pipeline Project Phase 2 (5TP2) Location : Nonthaburi Province , Phra Nakh..
ReadmoreProject owner : PTT Public Company Limited Project : Fifth Transmission Pipeline Project Phase 2 (5TP2) Location : Nonthaburi Province , Phra Nakh..
ReadmoreProject owner : PTT Public Company Limited Project : Fifth Transmission Pipeline Project Phase 2 (5TP2) Location : Nonthaburi Province , Phra Nakh..
ReadmoreProject Owner : Fuel Pipeline Transport Company Limited (FPT) Project : Northern Fuel Pipeline Transportation (NFPT) Location : Tak Province , Lam..
ReadmoreBrief Information: locate the pipeline position which were constructed in HDD work method. Located 25 HDD pipeline positions and total length is lon..
ReadmoreBrief Information: Gas steel pipeline, 28 inch mainline and 4”, Granite (hard rock),total HDD length is 1102m, 1 crossing. Work Location: In Ra..
ReadmoreBrief Information: Steel Gas Pipeline,42inch, soil, the total completed BORED length is 108m. Work Location: Chachongsao,Thailand. Jacking Machine: ..
ReadmoreBrief Information: Oil steel pipeline, 16 inch, Marble, limestone (hard rock),total HDD length is 4200m, 6 crossing. Work Location: In Saraburi, Lopb..
ReadmoreBrief Information: Oil steel pipeline, 12 inch, Granite (hard rock),HDD length is 1400m, 665m, 735m and 220m. Work Location: In TAK City of Thailand...
ReadmoreBrief Information: MEA-30 Pieces PE pipeline HDD Crossing, 180mm*30, Soil Stratum, 370m, in BKK. Work Location: BKK, Thailand HDD Rig: GD-2200..
ReadmoreBrief Information: Natural Gas pipeline HDD Crossing, 56 inch, Soil Stratum, 755m, 860m, 750m. Work Location: In Tianjin area, China. HDD Rig:..
ReadmoreBrief Information: Oil steel pipeline, 12 inch, Granite (hard rock), From KP37+840-KP39+930,HDD length is 2090m. Work Location: In north of Thailand...
ReadmoreHDD Brief Information: 4060 m /159mm/508mm/ Steel Pipe/ Gravel, sand Stratum Project Information: Zhanjiang Guangdong Province, Chi..
ReadmoreHDD Brief Information: 5022m /30inch/ Steel Pipe/ Gravel, sand and Rock Stratum Project Information: Rachaburi area, RRPP Project i..
ReadmoreHDD Brief Information: 1700m /36 inch/ Steel Pipe/ Soil Stratum Project Information: 5TP Project in Thailand HDD Rig: GD-6000L, Th..
ReadmoreHDD Brief Information: 1400m /42 inch/ Steel Pipe/ Gravel, sand and Rock Stratum Project Information: Rayong Gulf area, 5TP Project..
ReadmoreHDD Brief Information: 600m /42 inch/ Steel Pipe/ Granite Rock Stratum Project Information: Chonburi , 5TP Project in Thailand HDD..
ReadmoreCompleted HDD Brief Information: 4.5km/5 mini HDD &1 HDD/30 inch/ Steel Pipe/ Gravel, sand and Rock Stratum Project Information: Rachaburi area..
ReadmoreHDD Brief Information: 1100m/9 HDD /12 inch/ Steel Pipe/ Gravel, sand and Rock Stratum Project Information: Rayong area, WHA-NGD Project in Thailan..
ReadmoreHDD Brief Information: 1400m /42 inch/ Steel Pipe/ Gravel, sand and Rock Stratum Project Information: Rayong Gulf area, 5TP Project in Thailand HD..
ReadmoreHDD Brief Information: 450m /42 inch/ Steel Pipe/ Clay& silkStratum Project Information: Chonburi , 5TP Project in Thailand HDD Ri..
ReadmoreHDD Brief Information: 600m /42 inch/ Steel Pipe/ Granite Rock Stratum Project Information: Chonburi , 5TP Project in Thailand HDD Rig..
ReadmoreHDD Crossing stratum is granite, Gravel, Sand, the totalHDD length is 2200m and the diameter is 14 inch. Work Location: In the north of Thailand. ..