Pipeline Crossing Engineering (Thailand) Co., Ltd (PCE) is a professional company specializing in pipeline HDD and other pipeline construction. Persisting the core business of pipeline construction technology, emphasizing its high-level business, PCE develops its way of growing by implementing the HDD, Boring and other pipeline construction, integration of construction and service, integration of domestic and international markets.
PCE has constructed more than 200 HDD and lots of other pipeline construction, totally more than 250 km HDD. Some of PCE key persons have constructed pipelines in China such as Song Huajiang River Crossing Technical Director of HDD Crossing Project, Jiangyin Yangtze River EPC HDD Project, etc. After PCE establishing, it had completed many big projects in different countries like 1400 meters gulf HDD crossing which is the biggest HDD project in Thailand, 4060 meters Dongming sea area crossing, etc. Through these projects, PCE has strengthened its position as a big pipeline construction contractor in China.
Internationally, PCE and his workers has executed lots of pipelines construction in various countries such as in Thailand, Bangladesh, Philippines, Pakistan, Malaysia and other countries, which has been built an international famous brand.
Company Name |
PIPELINE CROSSING ENGINEERING (THAILAND) CO.,LTD. |
Tel. No |
+66 855659015 |
Company Address |
94/85 PHUKSA VILLE,MOO1 ,BAN MAI , PAKKRED ,NONTHABURI 11120 |
Fax No |
|
Enterprise nature |
Thailand |
Founding Time |
2017.09.26 |
Registered Capital |
100,000,000.00 THB |
Legal Representative |
MR. Xu Liangkui |
Business License Number |
Taxpayer Identification Number 0115560023042 head office |
||
Business Scope |
Contract for pipeline construction, lease of large machinery and construction equipments, sale of oil and lubricants, investment and management consultants, and provide engineering management advice for technical projects |
||
Corporate Expertise |
Pipeline Construction, HDD Crossing, Boring Crossing. |
PCE (Thai) Completed HDD Projects | ||||||||
No. | Project | Country | OWNER/Main-Contractor | Lgth. | Dia. | Stratum | Drill Rig | Working Time |
1 | 5TP-1 | THAI | PTT/SNP | 1400/750/ 629/450m | 42" | Rock/Soil | 600T | 2018.03-2019.05 |
2 | 5TP-1 | THAI | PTT/SNP | 1680/ 1700m | 36" | Soil | 600T | 2019.06-2020.01 |
3 | RRPP | THAI | PTT/CPP | 5.02km (17HDD) | 30" | Soil | 350T/110T | 2018.12-2019.12 |
4 | NFPT | THAI | FPT/Triton | 16km (21HDD) | 12" | Rock | 350T/220T/110T | 2019.04-2021.05 |
5 | MEA-HDD | THAI | MEA/Sino-Thai | 362/382m | 30*180mm | Soil | 220T | 2020.11-2021.04 |
6 | OPENE | THAI | TPN/CPP | 4.2km (6HDD) | 16" | Rock | 600T/350T/ 220T | 2021.05-2021.09 |
7 | ITCP | THAI | PTTLNG/ITD | 1.1km (1HDD) | 28“+4” | Rock | 600T | 2022.03-2022.08 |
8 | RPJP1 | THAI | FPT/Triton | 750m | 14" | Sand | 220T | 2022.03-2022.04 |
9 | HKPPL | THAI | GULF/CPP | 8.2km (9HDD) | 24" | Rock | 350T/110T/220T | 2022.06-2023.04 |
10 | BPK-HDD | THAI | EGAT/SiamRaj | 1.6km (4HDD) | 20“/28” | Soil | 220T/110T | 2023.03-2023.07 |
11 | RFPT2 | THAI | FPT/Triton | 1.4km (3HDD) | 14" | Soil | 220T/45T | 2023.04-2023.07 |
12 | NS-HDD | THAI | PTT/YJ | 6.2km (9HDD) | 6" | Rock | 220T/110T/45T | 2023.09-2024.05 |
13 | RS Pipe Removal | THAI | PTT/YJ | 14km | 24”/12”/6" | Soil | 600T/ 220T/110T/45T | 2024.05 (ongoing) |
14 | BSPP2-HDD | THAI | PTT/SNP | 1150/ 1050m | 36" | Soil | 600T | 2024.08 (ongoing) |
PCE (CN) Completed HDD Projects (Main Case) | ||||||||
1 | Zhanjiang HDD | CN | Gov. | 4060m*3 | 20" | Soil | 600T/500T | 2018.08-2019.07 |
2 | Zhanjiang HDD-2 | CN | Gov. | 2000m*3 | 20" | Soil | 600T/500T | 2019.07-2019.11 |
3 | CHN-RUSS Tianjing HDD | CN | CNPC | 630/650/ 780m | 48" | Soil | 600T/500T | 2020.06-2020.09 |
4 | Tianjing LNG HDD | CN | Gov. | 655/750/ 860m | 56" | Soil | 1000T/600T | 2020.11-2021.08 |
5 | Jiangsu-Rudong Gas Pipeline | CN | CNPC | 6Km (7HDD) | 48" | Soil | 1000T/600T | 2022.01-2022.12 |
6 | Raoyang River HDD Crossing | CN | CNPC | 2300Km*2 | 48" | Soil | 1000T/600T | 2022.06-2023.02 |
7 | Zhanjiang offshore Crossing | CN | CNOOC | 2200Km*5 | 6”/20” | Rock | 1000T/600T | 2023.08-2024.04 |
8 | Fuzhou River Crossing | CN | SWG | 2100m | 40” | Sand | 1000T/600T | 2024.02-2024.06 |
PCE Completed Bored/Pipeline Projects (Main Case) | ||||||||
1 | 5TP-1 | THAI | PTT/SNP | 2.8km (25 Bored) | 42“/36" | Soil | Jacking | 2018.06-2020.05 |
2 | CNPC gas pipe | CN | CNPC | 4km+ (20+ Bored) | 40”-48” | Soil | Jacking | 2021.01-2023.12 |
3 | Fuzhou Project | CN | SWG | 800m (4 Bored) | 40” | Soil | Jacking | 2024.02-2024.06 |
4 | Pipe Welding with HDD | CN | CNPC | 6Km (7HDD) | 48" | Soil | 1000T/600T | 2022.01-2022.12 |
5 | Pipe Welding with HDD | CN | CNPC | 2300Km*2 | 48" | Soil | 1000T/600T | 2022.06-2023.02 |
6 | Pipe Welding with HDD& Bored | CN | SWG | 3km | 40” | Sand | 1000T/600T | 2024.02-2024.06 |
6 | BSPP1-Bored | THAI | PTT/CPP | 4.5km (18 Bored) | 36" | Soil | Jacking | 2024.04 ongoing |
No. |
Name |
Year experience |
Specialty |
Position |
1 |
Ma Dianfei |
15 |
Industrial Engineering |
General Manager |
2 |
Xu Liangkui |
9 |
Geological Engineering |
Project Manager |
3 |
Wan Yang |
9 |
Mechanical Engineering |
Project Manager |
4 |
Yang Dachun |
20 |
HDD Crossing Construction |
Supervisor |
5 |
Wang Min |
10 |
Civil Engineering |
Construction Manager |
6 |
Xia Wenchao |
5 |
Mechanical Engineering |
Technical Engineer |
7 |
Bai zhongjuan |
6 |
Civil Engineering |
Quality Inspector |
8 |
Chen jiawei |
5 |
Mechanical Engineering |
Technical Engineer |
9 |
Li minggang |
7 |
HDD Crossing Construction |
Driller |
10 |
Shi yangcheng |
10 |
Mechanical Engineering |
Mechanical Engineer |
11 |
Ma chengzhuang |
21 |
HDD Project Management |
Supervisor |
12 |
Liu wutian |
16 |
HDD Crossing Construction |
Mud Engineer |
13 |
Wang Yuanbin |
9 |
HDD Crossing Construction |
Foreman |
14 |
Zou Hengcong |
9 |
HDD Crossing Construction |
Foreman |
15 |
Wei Xing |
10 |
HDD Mud Engineering |
Mud Engineer |
16 |
Xiao Hongwei |
10 |
Electric Engineering |
Electrician |
17 |
Kuang Tong |
4 |
HDD Crossing Construction |
Driller |
18 |
Wang Yizhong |
20 |
Electric Engineering |
Electrician |
19 |
Cao Yabin |
10 |
HDD Crossing Construction |
Driller |
NO. |
Equipment |
Model |
Capacity |
QTY |
Manufacturer |
Country |
1 | HDD Rig | GD10000-L | 1000 Tons Pullback Load | 1 | GOODENG | THAI/CHA |
2 | HDD Rig | GD6000-L | 600 Tons Pullback Load | 2 | GOODENG | THAI/CHA |
3 | HDD Rig | GD5000-L | 500 Tons Pullback Load | 1 | GOODENG | CHA |
4 | HDD Rig | GD4000-L | 400 Tons Pullback Load | 1 | GOODENG | THAI |
5 | HDD Rig | GD3000-L | 300 Tons Pullback Load | 1 | GOODENG | THAI |
6 | HDD Rig | GD2200-L | 220 Tons Pullback Load | 1 | GOODENG | THAI |
7 | HDD Rig | GD1100-L | 110 Tons Pullback Load | 1 | GOODENG | THAI |
8 | HDD Rig | GD450-L | 45 Tons Pullback Load | 1 | GOODENG | THAI |
9 | HDD Rig | GD950-L | 95 Tons Pullback Load | 2 | GOODENG | THAI/CHA |
10 | Mud Pump | GN-2500 | 2.5 m³/min | 6 | GOODENG | CHA/THAI |
11 | Mud Pump | GN-1800 | 1.8 m³/min | 2 | GOODENG | CHA/THAI |
12 | Mud Pump | GN-800 | 0.8 m³/min | 2 | GOODENG | CHA/THAI |
13 | Mud System | CNQ/CSQ | 60-120 m³/hour | 10 | SDQZ | CHA/THAI |
14 | Generator | 300KW | 4 | CUMMINS | CHA/THAI | |
15 | Generator | 200KW | 5 | CUMMINS | CHA/THAI | |
16 | Generator | 100/50KW | 10 | CUMMINS | CHA/THAI | |
17 | Generator | 8KW | 4 | CUMMINS | CHA/THAI | |
18 | Jacking Machine | TPN-914 | 36 inch | 3 | Tangxing | CHA/THAI |
19 | Jacking Machine | TPN-1066 | 42 inch | 2 | JianBang | CHA/THAI |
20 | Jacking Machine | XND-500 | 2 | XCMG | CHA/THAI | |
21 | Welding Machine | Semi-Auto | 6 | XiongGu | CHA/THAI | |
22 | Slurry pump | 22KW | 6 | CHA/THAI | ||
23 | Slurry pump | 22KW | 12 | CHA/THAI | ||
24 | Submersible pump | 4 inch | 25 | CHA/THAI | ||
25 | Submersible pump | 3 inch | 28 | CHA/THAI | ||
26 | Pipe Thruster | GT5000 | Direct Piping 500 Tons | 2 | Goodeng | China |